With a massive, 240 ton payload and a host of new features, the first of Caterpillar’s next-generation CAT 793 XE Early Learner battery electric trucks has arrived at Newmont’s Cripple Creek and Victor (CC&V) mine in Teller County, Colorado.
“In less than two years, we went from retrofitting an existing piece of equipment at our proving ground to designing a ruggedized solution ready for validation at our customers’ sites,” explains Caterpillar Vice President, Brian Weller. “This was not a small change. Just about everything in the powertrain has been enhanced while still leveraging proven components of our Cat 793 model. With these changes, we still have learning to do with our customers in real-world applications.”
The next phase of Caterpillar’s Early Learner program will see the company attempt to integrate multiple electrified trucks at a single site with remote operators, validating the integration of a battery electric fleet with CAT’s existing autonomous and fleet management systems.
The Newmont gold mining operation has a long-standing “strategic alliance” with Caterpillar (signed in 2021) that aims to deliver a fully connected, automated, zero carbon emitting, end-to-end mining operation by 2050 while reducing downtime and operating costs.
Electrek’s Take
As I’ve said before, EVs and mining to together like peanut butter and jelly. In confined spaces, the carbon emissions and ear-splitting noise made by conventional, ICE-powered mining equipment can create dangerous circumstances that can lead to serious injuries (or worse), and that’s just going to make it even harder for a mining operation to keep people working and minerals coming out of the ground.
By working with companies like Caterpillar to prove that forward-looking electric equipment can do the job as well as well as (if not better than) their internal combustion counterparts, Newmont will go a long way towards converting what’s left of the ICE faithful.