Connect with us

Published

on

Drako has unveiled its second vehicle, the Drako Dragon: A bold new $290,000 electric SUV that can accelerate from 0 to 60 mph in 1.9 seconds.

Our first introduction to Drako was back in 2019 when the company unveiled the Drako GTE, a limited-production all-electric supercar with insane specs.

The San Jose-based company was founded by Dean Drako, better known as the cofounder and CEO of Barracuda Networks, and Shiv Sikand, an electrical engineer and cofounder of IC Manage. They repurposed the chassis of the Fisker Karma to create the electric vehicle.

We got a test ride in the Drako GTE in 2020 and came out impressed by Drako’s quad motor powertrain with each motor capable of a power range of +225 kW to -225 kW.

At the time, we figured that the GTE with the Fisker body was more of a test bed for that impressive powertrain, and we expected Drako to launch something else built from the ground up with it.

That something else is the Drako Dragon. It was announced last summer with some teaser images and specs, but now we get the whole unveiling.

Drako Dragon

Again, the Dragon is all about the performance, thanks to the insane electric powertrain developed by Drako.

According to the company, it enables a top speed of over 200 mph and a quarter-mile in just nine seconds:

Just how mind blowing is the performance? There really is nothing that properly compares. Dragon’s four electric motors combine to provide 2,000 horsepower enabling face-stretching 0-60 mph runs of 1.9 seconds, quarter-mile times of 9.0 seconds, and a top speed in excess of 200 mph. With great power comes great responsibility, so Dragon is equipped with carbon ceramic rotors at all four corners. The front brakes use 10-piston calipers on 420-mm discs, while the rear brakes use 6-piston calipers on 410-mm discs.

But Drako already impressed with its performance with the GTE; where the Dragon shines is with the merging of that level of performance with a stunning new design enabled by building the new vehicle from the ground up.

The design is quite unique and bold, but it works for me. Move over Lamborghini Urus, this is the new standard for hyper SUV.

Drako is claiming some first with the Dragon, including being “the world’s first production SUV with a full carbon fiber structure.” The company claims that it will save 50% of the weight of the chassis.

The company is also future-proof with a charging capacity of up to 500 kW. Drako also expects the Dragon to have a EPA-rated range of 420 miles.

One of the biggest improvements over the GTE is the interior. That’s obviously enabled by the SUV form-factor, but also the fact that the GTE was super limited by the Fisker chassis.

Now as you can put together from the performance and design, the Dragon is not cheap, but at $290,000, it is a significant improvement over the price of the $1 million price tag of the Drako GTE.

Despite the supercar-price, Drako believes that it can ramp up production to 5,000 units per year.

The Dragon will be produced in the US with production and deliveries expected to begin in 2026.

Drako has opened reservations today with a $500 deposit for the regular version or a $5,000 deposit for the First Edition model, which is limited to 99 units.

Drako Dragon Specs:

Powertrain Quad Motor Powertrain with Drako DriveOS NanoControl
Horsepower 2,000 hp
Acceleration 0 – 60 mph 1.9 seconds
Acceleration 1⁄4 mile 9.0 seconds
Top Speed Over 200 mph
Range 420 miles (EPA est.)
Fast Charging 500 kW capability
Brakes Front: 420mm carbon ceramic rotors and 10 piston calipers
Rear: 410mm carbon ceramic rotors and 6 piston calipers
Wheels 23 inch
Tires Front: 285/30/23
Rear: 325/30/23
Length 199 inches
Width 81 inches
Height 63 inches (Cruise suspension setting)
Ground Clearance Tarmac suspension setting: 6.4 inches
Cruise suspension setting: 8.4 inches
Overland suspension setting: 12.4 inches
Towing Capacity 3,500 lbs
Curb Weight 4,969
Base Price $290,000

Electrek’s Take

I had to digest it for a while, but I am a fan. At first, I was wondering what they are thinking aiming to produce 5,000 unis per year of a $290,000 vehicle, but I think it is onto something.

The Dragon sorts of carves its own space in the auto industry with top of the line performance in a unique and attractive form factor.

Those are things that will attract people who have $300,000 to spend on a car.

If had that kind of money to spend on a car, I honestly can’t think of anything else I’d want to spend it on. Maybe the new Tesla Roadster if it is ever available, but I think it would be a close call with the Dragon.

FTC: We use income earning auto affiliate links. More.

graphical user interface, website

Continue Reading

Environment

400 kW DC fast charging On The Run arrives in Canada – and it’s FREE!

Published

on

By

400 kW DC fast charging On The Run arrives in Canada – and it's FREE!

British Columbia got its first 400 kW DC fast charger last week at Canadian C-store chain On The Run, but that’s not the good part. As part of a limited time offer, these chargers are FREE!

The Canadian convenience store chain just took the wraps off its new, ABB-developed, 400 kW chargers earlier this month, but they’re already planning to bring the ultra-fast 400 kW dispensers to at least four more locations in BC this spring, and have them online just in time for the summer road trip season – something On The Run hopes its customers will appreciate.

“The A400 charger delivers an enhanced customer experience, with reliability and performance from a 32-inch screen to higher power charging sessions and power sharing,” reads the company’s official announcement, via LinkedIn. “Download the Journie Rewards app to start the charge – free for a limited time.”

On The Run’s new 400 kW ABB DC fast chargers are compatible with CCS and CHAdeMO plugs, and can accommodate Tesla and other NACS-equipped vehicles with an adapter. That said, the company seems to imply that Tesla drivers in particular will have a maximum charging speed of “just” 50 kW, which feel hilarious (given the current state of affairs between Tesla and the Canadian government), but probably isn’t.

Advertisement – scroll for more content

In addition to the ABB A400 400 kW units shown here, On The Run locations also employ the ABB Terra 184 dispensers rated at 180 kW. On The Run plans similar deployments at the four BC locations mentioned above, as well as two more each in Quebec and Ontario slated to go live towards the end of this year.

Electrek’s Take

Tesla’s controversial CEO Elon Musk once mocked 350 kW charging speed as being “for a child’s toy,” despite the fact that, nearly nine years later, his own cars and Superchargers can barely make it to 325 kW while others have sailed right on past. I made fun of that fact on the Quick Charge episode shown, above – and, while I do think it’s funny and relevant, the much more relevant piece of news here is that companies like BP Pulse, Revel, and Wallbox are actively deploying 400 kW solutions, today (while others hit the same mark as far back as 2017).

It’s just a fact: Tesla has fallen way behind.

SOURCE | IMAGES: On The Run, via Electric Autonomy.

FTC: We use income earning auto affiliate links. More.

Continue Reading

Environment

Terawatt opens its first electric charging truck stop in California

Published

on

By

Terawatt opens its first electric charging truck stop in California

Terawatt Infrastructure‘s first medium- and heavy-duty electric charging truck stop in California is now online, in Rancho Dominguez.

Located 12 miles north of the ports of Long Beach and Los Angeles, the private Rancho Dominguez site, which is shared among multiple fleets, will support electric trucking fleet operations in and out of the largest container ports in the US.

First customers include Dreaded Trucking, Hight Logistics, PepsiCo, Quick Container Drayage, Southern Counties Express, Tradelink Transport, and WestCoast Trucking & Warehousing.

Terawatt’s electric charging truck stop features 20 pull-through and bobtail DC fast charging stalls with a capacity of 7 megawatts (MW), enabling charging for up to 125 trucks per day using a simple reservations system. Terawatt’s site features a proprietary charge management system, in-house technicians, 24/7 customer service, and onsite parts management.

Advertisement – scroll for more content

“This launch underscores growing collaboration between enterprises, shippers, carriers, and charging infrastructure providers to advance sustainable technologies across logistics and transportation operations, especially in the medium and heavy-duty sectors,” said Neha Palmer, CEO and cofounder of Terawatt. Palmer added that the company will bring another charging site online in Rialto, California, in June.

Terawatt joined some of the world’s largest shippers and carriers in September 2024 to launch the I-10 Consortium heavy-duty EV operations pilot, the “first-ever US over-the-road electrified corridor.” Terawatt is providing charging infrastructure, including software, operations, and maintenance support at six of its owned charging hubs along the I-10 corridor.


If you live in an area that has frequent natural disaster events, and are interested in making your home more resilient to power outages, consider going solar and adding a battery storage system. To make sure you find a trusted, reliable solar installer near you that offers competitive pricing, check out EnergySage, a free service that makes it easy for you to go solar. They have hundreds of pre-vetted solar installers competing for your business, ensuring you get high quality solutions and save 20-30% compared to going it alone. Plus, it’s free to use and you won’t get sales calls until you select an installer and share your phone number with them.

Your personalized solar quotes are easy to compare online and you’ll get access to unbiased Energy Advisers to help you every step of the way. Get started here. –trusted affiliate link*

FTC: We use income earning auto affiliate links. More.

Continue Reading

Environment

Trump admin halts $5 billion NY offshore wind project mid-build

Published

on

By

Trump admin halts  billion NY offshore wind project mid-build

In its most aggressive attack against offshore wind yet, the Trump administration halted the $5 billion Empire Wind 1, already under construction off New York’s coast.

Norwegian developer Equinor announced yesterday that it received notice from the Bureau of Ocean Energy Management (BOEM) ordering Empire Wind 1 to halt all activities on the outer continental shelf until BOEM has completed its review. Interior Secretary Doug Burgum posted this tweet yesterday:

Burgum gave no indication of what insufficiencies there were in the approval process for the fully permitted offshore wind project, despite Trump’s recent declaration of a national energy emergency that speeds up permitting processes.

The commercial lease for the 810-megawatt (MW) Empire Wind 1’s federal offshore wind area was signed in March 2017 during the first Trump administration. It was approved by the Biden administration in November 2023 and began construction in 2024.

Advertisement – scroll for more content

The project is being developed under contract with the New York State Energy Research and Development Authority (NYSERDA). Empire Wind 1, which was due to come online in 2027, has the potential to power 500,000 New York homes.

“Halting construction of fully permitted energy projects is the literal opposite of an energy abundance agenda,” said American Clean Power Association CEO Jason Grumet in a statement. “We encourage the administration to quickly address perceived inadequacies in the prior permit approvals so that this project can complete construction and bring much-needed power to the grid.”

As Electrek reported, Equinor secured $3 billion to finance Empire Wind 1 in January. The total amount drawn under the project finance term loan facility as of March 31 was around $1.5 billion. 

As of March 31, Empire Wind has a gross book value of around $2.5 billion, including South Brooklyn Marine Terminal (pictured above), which was expected to become the US’s largest dedicated port facility for offshore wind.

In response to BOEM’s stop work order, New York Governor Kathy Hochul issued the following statement:

Every single day, I’m working to make energy more affordable, reliable and abundant in New York and the federal government should be supporting those efforts rather than undermining them. Empire Wind 1 is already employing hundreds of New Yorkers, including 1,000 good-paying union jobs as part of a growing sector that has already spurred significant economic development and private investment throughout the state and beyond.

As Governor, I will not allow this federal overreach to stand. I will fight this every step of the way to protect union jobs, affordable energy and New York’s economic future.

Equinor says it’s considering appealing BOEM’s order.


To limit power outages and make your home more resilient, consider going solar with a battery storage system. In order to find a trusted, reliable solar installer near you that offers competitive pricing, check out EnergySage, a free service that makes it easy for you to go solar. They have hundreds of pre-vetted solar installers competing for your business, ensuring you get high-quality solutions and save 20-30% compared to going it alone. Plus, it’s free to use and you won’t get sales calls until you select an installer and you share your phone number with them.

Your personalized solar quotes are easy to compare online and you’ll get access to unbiased Energy Advisers to help you every step of the way. Get started here. –trusted affiliate link*

FTC: We use income earning auto affiliate links. More.

Continue Reading

Trending