The all-electric muscle car you’ve been waiting for is finally here. You can now officially order Dodge’s first electric muscle car, the 2024 Charger Daytona R/T. Dodge is offering a “VIP Experience” and other exclusive First Call content for those who order early.
The 2024 electric Charger Daytona Scat Pack remains “the world’s quickest and most powerful muscle car,” Dodge claims. With up to 670 hp and 627 lb-ft of torque, the Charger EV packs “SRT-like performance” for a 0 to 60 mph sprint in 3.3 seconds.
Dodge’s Scat Pack model comes with a Direct Connection Stage 2 upgrade straight from the factory. The base R/T model has a Stage 1 kit for 496 hp and 404 lb-ft of torque for a 0 to 60 mph time in 4.7 secs.
Last month, we learned that the 2024 Dodge Charger Daytona R/T will start at $59,995, while the high-performance Scat Pack model will cost $73,190. Both models qualify for the $7,500 EV tax credit.
Dodge opens electric Charger Daytona orders
Now, you can finally order Dodge’s electric Charger. Dodge opened orders for the 2024 Charger Daytona on Monday with an exclusive First Call VIP experience.
You can find Charger Daytona-certified dealers on DodgeGarage.com that have vehicles en route or can help you order one. The company said models will begin arriving at dealerships in the fourth quarter.
Dodge also released a new Charger configurator tool for an immersive look at the interior and exterior options.
Those who take delivery of a Dodge Charger Daytona sold order placed by October 31, 2024, get exclusive First Call content and a VIP experience. Dodge will provide two days of performance driving school for the new electric Charger.
2024 Dodge Charger Daytona EV trim
Horsepower
0 to 60 mph time
Starting price
Dodge Charger Daytona R/T
496 hp
4.7 seconds
$59,995
Dodge Charger Daytona Scat Pack
670 hp
3.3 seconds
$73,190
2024 Dodge Charger Daytona prices and specs (excluding a $1,995 destination fee)
You will also receive an exclusive VIP concierge to help with any questions and guide you through the delivery process. The First Call welcome kit includes an official letter of authenticity stating you own a First Call Dodge Charger Daytona, Dodge-branded driving gloves, “and more.”
FTC: We use income earning auto affiliate links.More.
Wind energy powered 20% of all electricity consumed in Europe (19% in the EU) in 2024, and the EU has set a goal to grow this share to 34% by 2030 and more than 50% by 2050.
To stay on track, the EU needs to install 30 GW of new wind farms annually, but it only managed 13 GW in 2024 – 11.4 GW onshore and 1.4 GW offshore. This is what’s holding the EU back from achieving its wind growth goals.
Three big problems holding Europe’s wind power back
Europe’s wind power growth is stalling for three key reasons:
Permitting delays. Many governments haven’t implemented the EU’s new permitting rules, making it harder for projects to move forward.
Grid connection bottlenecks. Over 500 GW(!) of potential wind capacity is stuck in grid connection queues.
Slow electrification. Europe’s economy isn’t electrifying fast enough to drive demand for more renewable energy.
Brussels-based trade association WindEurope CEO Giles Dickson summed it up: “The EU must urgently tackle all three problems. More wind means cheaper power, which means increased competitiveness.”
Permitting: Germany sets the standard
Permitting remains a massive roadblock, despite new EU rules aimed at streamlining the process. In fact, the situation worsened in 2024 in many countries. The bright spot? Germany. By embracing the EU’s permitting rules — with measures like binding deadlines and treating wind energy as a public interest priority — Germany approved a record 15 GW of new onshore wind in 2024. That’s seven times more than five years ago.
If other governments follow Germany’s lead, Europe could unlock the full potential of wind energy and bolster energy security.
Grid connections: a growing crisis
Access to the electricity grid is now the biggest obstacle to deploying wind energy. And it’s not just about long queues — Europe’s grid infrastructure isn’t expanding fast enough to keep up with demand. A glaring example is Germany’s 900-megawatt (MW) Borkum Riffgrund 3 offshore wind farm. The turbines are ready to go, but the grid connection won’t be in place until 2026.
This issue isn’t isolated. Governments need to accelerate grid expansion if they’re serious about meeting renewable energy targets.
Electrification: falling behind
Wind energy’s growth is also tied to how quickly Europe electrifies its economy. Right now, electricity accounts for just 23% of the EU’s total energy consumption. That needs to jump to 61% by 2050 to align with climate goals. However, electrification efforts in key sectors like transportation, heating, and industry are moving too slowly.
European Commission president Ursula von der Leyen has tasked Energy Commissioner Dan Jørgensen with crafting an Electrification Action Plan. That can’t come soon enough.
More wind farms awarded, but challenges persist
On a positive note, governments across Europe awarded a record 37 GW of new wind capacity (29 GW in the EU) in 2024. But without faster permitting, better grid connections, and increased electrification, these awards won’t translate into the clean energy-producing wind farms Europe desperately needs.
Investments and corporate interest
Investments in wind energy totaled €31 billion in 2024, financing 19 GW of new capacity. While onshore wind investments remained strong at €24 billion, offshore wind funding saw a dip. Final investment decisions for offshore projects remain challenging due to slow permitting and grid delays.
Corporate consumers continue to show strong interest in wind energy. Half of all electricity contracted under Power Purchase Agreements (PPAs) in 2024 was wind. Dedicated wind PPAs were 4 GW out of a total of 12 GW of renewable PPAs.
If you live in an area that has frequent natural disaster events, and are interested in making your home more resilient to power outages, consider going solar and adding a battery storage system. To make sure you find a trusted, reliable solar installer near you that offers competitive pricing, check out EnergySage, a free service that makes it easy for you to go solar. They have hundreds of pre-vetted solar installers competing for your business, ensuring you get high quality solutions and save 20-30% compared to going it alone. Plus, it’s free to use and you won’t get sales calls until you select an installer and share your phone number with them.
Your personalized solar quotes are easy to compare online and you’ll get access to unbiased Energy Advisers to help you every step of the way. Get started here. –trusted affiliate link*
FTC: We use income earning auto affiliate links.More.
In the Electrek Podcast, we discuss the most popular news in the world of sustainable transport and energy. In this week’s episode, we discuss the official unveiling of the new Tesla Model Y, Mazda 6e, Aptera solar car production-intent, and more.
As a reminder, we’ll have an accompanying post, like this one, on the site with an embedded link to the live stream. Head to the YouTube channel to get your questions and comments in.
After the show ends at around 5 p.m. ET, the video will be archived on YouTube and the audio on all your favorite podcast apps:
We now have a Patreon if you want to help us avoid more ads and invest more in our content. We have some awesome gifts for our Patreons and more coming.
Here are a few of the articles that we will discuss during the podcast:
Here’s the live stream for today’s episode starting at 4:00 p.m. ET (or the video after 5 p.m. ET):
FTC: We use income earning auto affiliate links.More.
The Chinese EV leader is launching a new flagship electric sedan. BYD’s new Han L EV leaked in China on Friday, revealing a potential Tesla Model S Plaid challenger.
What we know about the BYD Han L EV so far
We knew it was coming soon after BYD teased the Han L on social media a few days ago. Now, we are learning more about what to expect.
BYD’s new electric sedan appeared in China’s latest Ministry of Industry and Information Tech (MIIT) filing, a catalog of new vehicles that will soon be sold.
The filing revealed four versions, including two EV and two PHEV models. The Han L EV will be available in single- and dual-motor configurations. With a peak power of 580 kW (777 hp), the single-motor model packs more power than expected.
BYD’s dual-motor Han L gains an additional 230 kW (308 hp) front-mounted motor. As CnEVPost pointed out, the vehicle’s back has a “2.7S” badge, which suggests a 0 to 100 km/h (0 to 62 mph) sprint time of just 2.7 seconds.
To put that into perspective, the Tesla Model S Plaid can accelerate from 0 to 100 km in 2.1 seconds. In China, the Model S Plaid starts at RBM 814,900, or over $110,000. Speaking of Tesla, the EV leader just unveiled its highly anticipated Model Y “Juniper” refresh in China on Thursday. It starts at RMB 263,500 ($36,000).
BYD already sells the Han EV in China, starting at around RMB 200,000. However, the single front motor, with a peak power of 180 kW, is much less potent than the “L” model. The Han EV can accelerate from 0 to 100 km/h in 7.9 seconds.
At 5,050 mm long, 1,960 mm wide, and 1,505 mm tall with a wheelbase of 2,970 mm, BYD’s new Han L is roughly the size of the Model Y (4,970 mm long, 1,964 mm wide, 1,445 mm tall, wheelbase of 2,960 mm).
Other than that it will use a lithium iron phosphate (LFP) pack from BYD’s FinDreams unit, no other battery specs were revealed. Check back soon for the full rundown.