The world’s first electric muscle car is finally here, and Dodge is already sweetening the deal for buyers. The Dodge Charger Daytona EV is launching with 0% APR, making it even cheaper to finance than the outgoing gas-powered model. Lease prices for the electric Charger start as low as $549 per month, but the Hellcat-like Scat Pack model may be an even better deal.
Dodge Charger EV launches with 0% APR offer
The first all-electric Dodge Charger has arrived, and surprisingly, it’s already becoming more affordable. In March, Dodge unveiled the Charger Daytona EV, kicking off “the next generation of Dodge muscle.”
According to Dodge brand CEO Tim Kuniskis, the electric Charger “delivers Hellcat Redeye levels of performance.” That’s for the Scat Pack model, which comes with a Direct Connection Stage 2 upgrade kit straight from the factory.
The upgrade delivers up to 670 hp and 627 lb-ft of torque for a 0 to 60 mph sprint in just 3.3 seconds. It can also cover a quarter mile in around 11.5 seconds.
In comparison, the 807 hp Dodge Charger SRT Redeye Jailbreak edition, powered by a Supercharged 6.2L HEMI SRT V8 engine, takes 3.6 seconds to get from 0 to 60 mph.
2024 Dodge Charger Daytona EV Scat Pack (Source: Stellantis)
With a Stage 1 upgrade, the base R/T trim has up to 456 hp and 404 lb-ft of torque, good for a 0 to 60 mph time in 4.7 seconds.
Dodge opened orders for the 2024 Charger Daytona EV in September, starting at $59,995. The High-performance Scat Pack trim starts at $73,190.
2024 Dodge Charger Daytona EV Scat Pack (Source: Stellantis)
According to a new dealer note viewed by online auto research firm CarsDirect, all 2024 Dodge Charger Daytona EV models are now eligible for 0% APR financing for up to 72 months.
2024 Dodge Charger Daytona EV trim
Horsepower
0 to 60 mph time
Starting price
Dodge Charger Daytona R/T
496 hp
4.7 seconds
$59,995
Dodge Charger Daytona Scat Pack
670 hp
3.3 seconds
$73,190
2024 Dodge Charger Daytona prices and specs (excluding a $1,995 destination fee)
The offer makes the electric Dodge charger even cheaper to finance than the outgoing 2023 Dodge Charger at 5.9% APR for the same 72 months. However, this is an individual offer and cannot be combined with other deals. Based on CarsDirect analysis, the 0% APR offer is limited to the Northeast, Southern, and Central US regions.
Dodge is also offering a $1,000 loyalty bonus for Stellantis (Jeep, Dodge, Ram, Chrysler) lessees that trade in for the electric Charger.
The interior of the 2024 Dodge Charger Daytona EV (Source: Stellantis)
Update 11/26/24: The 2024 Dodge Charger Daytona EV launches with lease prices starting at $549 for 36 months. With $4,999 due at signing, the effective rate is $688 per month (10,000 miles per year).
Although it may not seem cheap, it’s a pretty good deal for a $60,000 electric muscle car. According to CarsDirect analysis, the outgoing Challenger R/T has an effective cost of at least $853 per month. And that’s with an MSRP of just $43,235. The EV model is nearly $20,000 more on paper but significantly less to lease than the aging 2023 model.
2024 Dodge Charger Daytona EV Scat Pack (Source: Stellantis)
Meanwhile, the Scat Pack model may be an even better deal. With a lease money factor as low as 0.00006 on a 24-month lease, the Scat Pack trim is surprisingly lower than the lease rate of 0.00027 for the base R/T model.
It also has a higher residual value. On a 24-month lease, the Scat Pack trim has a 59% residual compared to the R/T’s 54%. With both trims eligible for a $7,500 lease incentive, the high-performance model could be an even better deal.
With the $7,500 EV tax credit incentive, eligible customers can save up to $8,500 on the 2024 Dodge Charger Daytona EV. You may want to act fast, as these deals expire on December 2, 2024.
Jeep, another Stellantis brand, launched lease prices at just $599 per month for its first luxury electric SUV last week, the Wagoneer S. Jeep’s electric Wagoneer is also available with 0% financing.
British oil and gasoline company BP (British Petroleum) signage is being pictured in Warsaw, Poland, on July 29, 2024.
Nurphoto | Nurphoto | Getty Images
British oil giant BP on Tuesday posted slightly weaker-than-expected first-quarter net profit, following a recent strategic reset and a slump in crude prices.
The beleaguered oil and gas major posted underlying replacement cost profit, used as a proxy for net profit, of $1.38 billion for the first three months of the year. That missed analyst expectations of $1.6 billion, according to an LSEG-compiled consensus.
BP’s net profit had hit $2.7 billion a year earlier and $1.2 billion in the final three months of 2024.
The results come as the energy major faces fresh pressure from activist investors less than two months after announcing a strategic reset.
Seeking to rebuild investor confidence, BP in February pledged to slash renewable spending and boost annual expenditure on its core business of oil and gas.
BP CEO Murray Auchincloss told CNBC’s “Squawk Box Europe” on Tuesday that the firm was “off to a great start” in delivering on its strategic reset.
“We had a great operational quarter. We had our highest upstream operating efficiency in history. Our refineries in the first quarter ran at the best they’ve run in 24 years. We had six exploration discoveries in a row, which is really unusual and we started out three major projects,” Auchincloss said.
For the first quarter, BP announced a dividend per ordinary share of 8 cents and a share buyback of $750 million.
Net debt rose to $26.97 billion in the January-March period, up from $22.99 billion at the end of the fourth quarter. BP had previously warned of lower reported upstream production and higher net debt in the first quarter, when compared to the final three months of last year.
Shares of BP fell 3.3% on Tuesday morning. The firm is down roughly 8% year-to-date.
Activist pressure
BP’s green strategy U-turn does not appear to have gone far enough for the likes of activist investor Elliott Management, which went public last week with a stake of more than 5% in the London-listed firm.
The disclosure makes the U.S. hedge fund BP’s second-largest shareholder after BlackRock, the world’s largest asset manager, according to LSEG data.
Elliott was first reported to have assumed a position in the oil and gas company back in February, driving a share price rally amid expectations that its involvement could pressure BP to shift gears back toward its oil and gas businesses.
BP’s Auchincloss declined to comment on interactions with investors when asked whether the firm was under pressure from the likes of Elliott to go beyond the plans announced in its February pivot.
Notably, BP suffered a shareholder rebellion at its annual general meeting earlier this month. Almost a quarter (24.3%) of investors voted against the re-election of outgoing Chair Helge Lund, a symbolic result that reflected a sense of deep frustration among the firm’s shareholders.
Mark van Baal, founder of Dutch activist investor Follow This, told CNBC last week that he hoped the shareholder revolt means Amanda Blanc, who is leading the process to find Lund’s successor, will look for a new chair who is “climate competent” and “will not respond to short-term activists so quickly.”
Lund is expected to step down from his role next year.
Takeover candidate
BP’s underperformance relative to industry peers such as Exxon Mobil, Chevron and Shell has thrust the energy major into the spotlight as a prime takeover candidate. Energy analysts have questioned, however, whether any of the likeliest suitors will rise to the occasion.
BP’s Auchincloss on Tuesday said that he wouldn’t speculate on whether the company is a takeover target, but confirmed the oil major had not asked for any sort of protection from the British government.
“What I will say is we’re a strong, independent company and we’ve got sector-leading growth. And if we can deliver the sector-leading growth, and the first quarter is a fantastic example of that, then I have no concerns. I think we’re going to do great,” Auchincloss said.
Murray Auchincloss, chief executive officer of BP, during the “CERAWeek by S&P Global” conference in Houston, Texas, on March 11, 2025.
Bloomberg | Bloomberg | Getty Images
Oil prices have fallen in recent months on demand fears. International benchmark Brent crude futures with June delivery traded at $65.19 per barrel on Tuesday morning, down more than 1% for the session. That’s lower from around $84 per barrel a year ago.
Asked whether weaker crude prices could put the some of the firm’s reset plans in jeopardy, Auchincloss said, “Not really. We have a balance of products that we think about that generate revenue for us. So, oil, natural gas and refined products as well.”
— CNBC’s Ruxandra Iordache contributed to this report.
Germany’s largest offshore wind farm under construction, EnBW’s He Dreiht, just hit a big milestone: The first enormous turbine is now up in the North Sea.
He Dreiht – which means “it spins” in Low German – is using Vestas’s massive 15 megawatt (MW) turbines, the first project in the world to install them. Just one spin of one of the rotors can generate enough electricity to power four households for an entire day.
When it’s finished, He Dreiht will have 64 mega turbines cranking out 960 megawatts (MW) of clean power – enough to supply around 1.1 million homes. And it’s being built without any government subsidies.
EnBW, one of Germany’s major energy companies, has been working in offshore wind for more than 15 years, but He Dreiht is their biggest project yet. “It will play a key role in helping us to significantly grow our renewable energy output from 6.6 GW to over 10 GW by 2030,” said Michael Class, who heads up EnBW’s generation portfolio development.
Advertisement – scroll for more content
The project is a win for Vestas, too. “With the installation of the first V236-15.0 MW, we have reached an important milestone for both the He Dreiht project and our offshore ramp-up, which helps Germany build a more secure, affordable, and sustainable energy system,” said Nils de Baar, president of Vestas Northern & Central Europe.
He Dreiht is located about 85 kilometers (53 miles) northwest of Borkum and 110 kilometers (68 miles) west of Helgoland. At peak times, more than 500 workers will be out at sea building the farm, using a fleet of more than 60 ships. EnBW’s offshore team in Hamburg is running the show.
The installation process is a major operation. The 64 foundations were already set in the seabed last year. Parts for the turbines are loaded onto the installation vessel Wind Orca in Esbjerg, Denmark, and shipped out in a 12-hour journey to the construction site. From there, the turbines are lifted into place. Meanwhile, crews are also working on internal wind farm cabling.
A partner consortium made up of Allianz Capital Partners, AIP, and Norges Bank Investment Management owns 49.9% of the shares in He Dreiht.
To limit power outages and make your home more resilient, consider going solar with a battery storage system. In order to find a trusted, reliable solar installer near you that offers competitive pricing, check outEnergySage, a free service that makes it easy for you to go solar. They have hundreds of pre-vetted solar installers competing for your business, ensuring you get high-quality solutions and save 20-30% compared to going it alone. Plus, it’s free to use and you won’t get sales calls until you select an installer and you share your phone number with them.
Your personalized solar quotes are easy to compare online and you’ll get access to unbiased Energy Advisers to help you every step of the way. Get startedhere. –trusted affiliate link*
FTC: We use income earning auto affiliate links.More.
Tesla has released a quick update about its Tesla Semi factory in Nevada. It says that it is on track for volume production of the electric semi truck in 2026.
The Tesla Semi was first scheduled to go into production in 2019, but it has faced numerous delays.
Now, it appears that there is finally some momentum to bring it to volume production.
For the last two years, Tesla has been working to build a new factory next to Gigafactory Nevada, where it builds the battery packs and drive units for most of its electric vehicles built in North America.
Advertisement – scroll for more content
Today, Tesla released a “progress update on the factory, confirming that it finished building and it’s now working on deploying the production lines:
Tesla had previously mentioned aiming for volume production by 2025, but it is now only talking about starting production toward the end of the year and ramping up next year.
The automaker reiterated its planned production capacity of 50,000 units.
They now expect to take deliveries of their first trucks later in 2026 and said that the price has increased “dramatically,” leading them to scale back their pilot program from 42 to 18 Tesla Semi trucks.
When originally unveiling the Tesla Semi in 2017, the automaker mentioned prices of $150,000 for a 300-mile range truck and $180,000 for the 500-mile version. Tesla also took orders for a “Founder’s Series Semi” at $200,000.
However, Tesla didn’t update the prices when launching the “production version” of the truck in late 2022. Price increases have been speculated, but the company has never confirmed them.
FTC: We use income earning auto affiliate links.More.