The new 2026 Nissan LEAF has an EPA-estimated driving range of up to 303 miles, but real-world tests suggest it can go even further.
New 2026 Nissan LEAF beats range estimates
Nissan upgraded its iconic electric hatch for its third generation, bringing a new style, faster charging, and over 300 miles of driving range.
The 2026 LEAF boasts 25% more driving range than the outgoing model with an official EPA rating of up to 303 miles. That’s a pretty big difference from the up to 212-mile rating on the 2025 LEAF SV Plus.
In the real world, it will likely drive even further. According to Edmunds, the new LEAF “far exceeded its official EPA estimate” in early tests.
Advertisement – scroll for more content
The 2026 Nissan LEAF Platinum+ was just put through the Edmunds EV Range Test, traveling 310 miles on a single charge. That’s for the Platinum+ trim, which has an official EPA-estimated driving range of just 259 miles. The SV+ is rated with 288 miles, while the base S+ has 303 miles.
The new 2026 Nissan LEAF (Source: Nissan)
Based on early tests, Edmunds expects all new LEAF trims to offer significantly more driving range than their ratings indicate.
Nissan’s new LEAF also topped the EPA’s efficiency expectations. The 2026 LEAF achieved an energy consumption of 27.8 kWh per 100 miles during the test, compared to the EPA estimated 33 kWh per 100 miles. That’s a nearly 16% improvement.
The new 2026 Nissan LEAF (Source: Nissan)
The Edmunds EV range test offers a more accurate estimate of a vehicle’s real-world range. It’s made up of 60% city and 40% highway with an average speed of 40 mph. The car stays within 5 miles of the posted speed limit, is set at its most efficient setting, and the climate control is set on auto at 72 degrees.
2026 Nissan LEAF trim
Starting Price
Driving Range (EPA-estimated)
LEAF S+
$29,990
303 miles
LEAF SV+
$34,230
288 miles
LEAF Platinum+
$38,990
259 miles
2026 Nissan LEAF EV prices and range by trim
Starting at $29,990, the 2026 Nissan LEAF is poised to challenge the Chevy Equinox EV on price and driving range.
The Chevy Equinox EV LT delivered 356 miles of range and an energy consumption of 28.9 kWh per 100 miles during the Edmunds EV Range Test.
The electric Equinox is currently the third-most-popular EV in the US, trailing only the Tesla Model Y and Model 3. Will the upgrades be enough for the LEAF to make a comeback?
Ready to test drive one to see for yourself? You can use our links below to find Nissan LEAF and Chevy Equinox EVs closest to you.
FTC: We use income earning auto affiliate links.More.
Solar panel giant Qcells announced today that it’s temporarily furloughing 1,000 US workers – 25% of its workforce – and reducing pay and shifts at its factories in northeast Georgia due to supply chain delays caused by US Customs.
Qcells furloughs 1,000 workers
The supply chain delays are hindering the company’s ability to import components to build its solar panels. This has resulted in Qcells’ two factories in Cartersville and Dalton being unable to operate at full capacity for several months.
Qcells spokeswoman Marta Stoepker shared the following statement in an exclusive with Channel 2 Action News in Atlanta:
The company says the furloughed workers, who were notified this afternoon, will retain full benefits and won’t be laid off. However, Qcells will no longer be using staffing agency employees in Georgia “at this time.”
Advertisement – scroll for more content
As Qcells introduced new supply chains to support its growing solar panel manufacturing facilities in Georgia, the company was recently forced to scale back production while our shipments into the US were delayed in the customs clearance process.
Although our supply chain operations are beginning to normalize, today we shared with our employees that HR actions must be taken to improve operational efficiency until production capacity returns to normal levels.
Stoepker said it expects to bring the furloughed workers back “in the coming weeks and months.” She continued:
Our commitment to building the entire solar supply chain in the United States remains. We will soon be back on track with the full force of our Georgia team delivering American-made energy to communities around the country.
Electrek’s Take
In January 2023, the Seoul-headquartered Qcells announced it would invest more than $2.5 billion to build a solar supply chain in Georgia – the largest-ever investment in clean energy manufacturing in the US to date. That included expanding the Dalton solar factory and building a fully integrated solar supply chain factory in Cartersville, Georgia, that will manufacture solar ingots, wafers, cells, and finished panels.
It’s not quite there yet, because that takes time. In the meantime, it’s being penalized by Customs. The US government under Trump says it’s keen on boosting domestic manufacturing. Why would it work against a company that’s onshoring an entire solar supply chain, including recycling?
Dalton and Cartersville employ nearly 4,000 people. Its total output will reach 8.4 GW of solar production capacity per year, which is equivalent to nearly 46,000 panels per day – enough to power approximately 1.3 million homes annually.
It’s ludicrous that it has been forced to furlough a quarter of its workforce due to the ineptness of the Trump administration’s US Customs policies. This is right up there with the ICE arrests at Hyundai’s plant in Georgia. Bravo.
The 30% federal solar tax credit is ending this year. If you’ve ever considered going solar, now’s the time to act. To make sure you find a trusted, reliable solar installer near you that offers competitive pricing, check out EnergySage, a free service that makes it easy for you to go solar. It has hundreds of pre-vetted solar installers competing for your business, ensuring you get high-quality solutions and save 20-30% compared to going it alone. Plus, it’s free to use, and you won’t get sales calls until you select an installer and share your phone number with them.
Your personalized solar quotes are easy to compare online and you’ll get access to unbiased Energy Advisors to help you every step of the way. Get started here.
FTC: We use income earning auto affiliate links.More.
The breakthrough EV batteries Toyota says will double driving range and cut charging times are facing another setback. The company is once again delaying plans for a new battery plant in Japan.
Why is Toyota delaying its EV battery plant this time?
Earlier this year, Toyota bought a 280,000-square-meter plot of land in Fukuoka, Japan, where it planned to build a plant to produce the more advanced EV batteries.
A location agreement was expected to be signed by April, but Toyota pushed back construction by several months, blaming slower-than-expected demand for electric vehicles.
The agreement was expected to be finalized this Fall, but that will no longer be the case. According to Nikkei, Toyota is delaying the EV battery plant for the second time. Toyota will review and adjust plans over the next year.
Advertisement – scroll for more content
Fukuoka governor, Seitaro Hattori, confirmed the news with reporters on Friday following a meeting with Toyota’s president, Koji Sato. Hattori also shut down claims that Toyota was planning to scrap the battery plant altogether.
Toyota EV battery roadmap (Source: Toyota)
Toyota again blamed slowing EV demand for the delay. The decision comes despite Keiji Kaita, president of Toyota’s Carbon Neutral Advanced Engineering Development Center, confirming at the Japan Mobility Show just last week that it’s “sticking on the schedule” to introduce its first solid-state battery-powered EV by 2028.
Last month, Toyota said it aimed to “achieve the world’s first practical use of all-solid-state batteries in BEVs” after securing a partnership with Sumitomo Metal Mining Co. to mass-produce them. It’s also working with Japanese oil giant Idemitsu.
Idemitsu’s value chain for solid electrolytes used in all-solid-state EV batteries (Source: Idemitsu)
The company recently revealed a solid-state battery pack prototype that it claims can deliver 747 miles (1,200 km) range and 10-minute fast charging, but will we ever see it actually in production?
Electrek’s Take
Toyota has been making empty promises about EV batteries for almost a decade now. It initially planned to introduce solid-state EV batteries in 2020, then pushed it to 2023, then 2026, and now it’s saying it will be around 2028.
Mass production is likely closer to the end of the decade, if Toyota doesn’t delay it again. While it’s blaming the slowing demand, global EV sales are still on the rise. According to Rho Motion, global EV sales topped 2 million for the first time in a single month in September 2025. Through the first nine months of the year, EV sales are up 26% compared to the same period in 2024.
Even with the US ending the $7,500 federal tax credit and other policies designed to promote electric vehicles, global adoption will continue building momentum over the next few years.
Is it a demand issue, or is Toyota just looking for another excuse? With rivals like Volkswagen, Mercedes-Benz, Hyundai, BMW, and Honda advancing next-gen EV batteries, Toyota will only fall further behind if it continues delaying key projects.
FTC: We use income earning auto affiliate links.More.
In the Electrek Podcast, we discuss the most popular news in the world of sustainable transport and energy. In this week’s episode, we discuss how Tesla is now Elon’s after the shareholders’ meeting, Xpeng going all-in on AI, Rivian’s earnings, and more.
As a reminder, we’ll have an accompanying post, like this one, on the site with an embedded link to the live stream. Head to the YouTube channel to get your questions and comments in.
After the show ends at around 5 p.m. ET, the video will be archived on YouTube and the audio on all your favorite podcast apps:
Advertisement – scroll for more content
We now have a Patreon if you want to help us avoid more ads and invest more in our content. We have some awesome gifts for our Patreons and more coming.
Here are a few of the articles that we will discuss during the podcast:
Here’s the live stream for today’s episode starting at 4:00 p.m. ET (or the video after 5 p.m. ET:
FTC: We use income earning auto affiliate links.More.