Chinese EV automaker ZEEKR has officially begun mass production of its 5th model, the MIX. The start of production in China comes mere days before ZEEKR launches the new MIX EV during a livestream event, where we will learn more about the ins and outs of this uniquely designed vehicle.
The MIX is a new van-like multi-purpose vehicle (MPV) from Geely-owned EV automaker ZEEKR. We first learned about ZEEKR’s fifth all-electric model in March when it shared the first official images.
At the time, details surrounding the MIX remained light, but its makers described that the new model would “break the constraints of space.” Designed with families who like to travel together in mind, this new compact MPV is truly unique, as it is too large to be a minivan yet somewhat compact for a full-size MPV.
Regulatory filings in China revealed that the ZEEKR MIX will arrive as a five-seat model – 4,688 mm in length, 1,995 mm in width, and 1,755 mm in height, offering a wheelbase of 3,008 mm. The specific ZEEKR MIX models submitted into the filing catalog were all single-motor versions with a maximum power of 310 kW.
The MIX is also expected to be powered by a new SEA-M architecture with lithium-ion ternary batteries supplied through a joint venture between industry giant CATL and ZEEKR’s parent company, Geely.
Previously, ZEEKR had also shared that the new EV will be the first mass-produced model of its kind to feature swiveling seats that enable front passengers to socialize with the back and even enjoy some hot pot cuisine while parked.
Some of those specs and features might have changed since March, and we will know for sure once the Chinese automaker officially launches the MPV in China later this week. However, mass production of the MIX is underway, and initial builds have already made their way to showrooms in China.
ZEEKR MIX to reach customers in China very soon
ZEEKR shared several images and videos of the start of the MIX production process in China on its Weibo page this morning, declaring that the new all-electric MPV “is finally here.”
As mentioned in the post, the first batch of MIX models built for customers have rolled off the assembly lines and will soon be headed to future homes. ZEEKR also posted the first launch commercial for the MIX EV, which you can view in detail here.
With production now underway, we simply need to wait for the official launch to learn more about the specific performance specs and pricing for the planned MIX variants. ZEEKR has been advertising the event all over Weibo, which will take place on the evening of October 23, China time.
We will share all the details of this new model when they become available. Check back with Electrek soon.
FTC: We use income earning auto affiliate links.More.
Wind energy powered 20% of all electricity consumed in Europe (19% in the EU) in 2024, and the EU has set a goal to grow this share to 34% by 2030 and more than 50% by 2050.
To stay on track, the EU needs to install 30 GW of new wind farms annually, but it only managed 13 GW in 2024 – 11.4 GW onshore and 1.4 GW offshore. This is what’s holding the EU back from achieving its wind growth goals.
Three big problems holding Europe’s wind power back
Europe’s wind power growth is stalling for three key reasons:
Permitting delays. Many governments haven’t implemented the EU’s new permitting rules, making it harder for projects to move forward.
Grid connection bottlenecks. Over 500 GW(!) of potential wind capacity is stuck in grid connection queues.
Slow electrification. Europe’s economy isn’t electrifying fast enough to drive demand for more renewable energy.
Brussels-based trade association WindEurope CEO Giles Dickson summed it up: “The EU must urgently tackle all three problems. More wind means cheaper power, which means increased competitiveness.”
Permitting: Germany sets the standard
Permitting remains a massive roadblock, despite new EU rules aimed at streamlining the process. In fact, the situation worsened in 2024 in many countries. The bright spot? Germany. By embracing the EU’s permitting rules — with measures like binding deadlines and treating wind energy as a public interest priority — Germany approved a record 15 GW of new onshore wind in 2024. That’s seven times more than five years ago.
If other governments follow Germany’s lead, Europe could unlock the full potential of wind energy and bolster energy security.
Grid connections: a growing crisis
Access to the electricity grid is now the biggest obstacle to deploying wind energy. And it’s not just about long queues — Europe’s grid infrastructure isn’t expanding fast enough to keep up with demand. A glaring example is Germany’s 900-megawatt (MW) Borkum Riffgrund 3 offshore wind farm. The turbines are ready to go, but the grid connection won’t be in place until 2026.
This issue isn’t isolated. Governments need to accelerate grid expansion if they’re serious about meeting renewable energy targets.
Electrification: falling behind
Wind energy’s growth is also tied to how quickly Europe electrifies its economy. Right now, electricity accounts for just 23% of the EU’s total energy consumption. That needs to jump to 61% by 2050 to align with climate goals. However, electrification efforts in key sectors like transportation, heating, and industry are moving too slowly.
European Commission president Ursula von der Leyen has tasked Energy Commissioner Dan Jørgensen with crafting an Electrification Action Plan. That can’t come soon enough.
More wind farms awarded, but challenges persist
On a positive note, governments across Europe awarded a record 37 GW of new wind capacity (29 GW in the EU) in 2024. But without faster permitting, better grid connections, and increased electrification, these awards won’t translate into the clean energy-producing wind farms Europe desperately needs.
Investments and corporate interest
Investments in wind energy totaled €31 billion in 2024, financing 19 GW of new capacity. While onshore wind investments remained strong at €24 billion, offshore wind funding saw a dip. Final investment decisions for offshore projects remain challenging due to slow permitting and grid delays.
Corporate consumers continue to show strong interest in wind energy. Half of all electricity contracted under Power Purchase Agreements (PPAs) in 2024 was wind. Dedicated wind PPAs were 4 GW out of a total of 12 GW of renewable PPAs.
If you live in an area that has frequent natural disaster events, and are interested in making your home more resilient to power outages, consider going solar and adding a battery storage system. To make sure you find a trusted, reliable solar installer near you that offers competitive pricing, check out EnergySage, a free service that makes it easy for you to go solar. They have hundreds of pre-vetted solar installers competing for your business, ensuring you get high quality solutions and save 20-30% compared to going it alone. Plus, it’s free to use and you won’t get sales calls until you select an installer and share your phone number with them.
Your personalized solar quotes are easy to compare online and you’ll get access to unbiased Energy Advisers to help you every step of the way. Get started here. –trusted affiliate link*
FTC: We use income earning auto affiliate links.More.
In the Electrek Podcast, we discuss the most popular news in the world of sustainable transport and energy. In this week’s episode, we discuss the official unveiling of the new Tesla Model Y, Mazda 6e, Aptera solar car production-intent, and more.
As a reminder, we’ll have an accompanying post, like this one, on the site with an embedded link to the live stream. Head to the YouTube channel to get your questions and comments in.
After the show ends at around 5 p.m. ET, the video will be archived on YouTube and the audio on all your favorite podcast apps:
We now have a Patreon if you want to help us avoid more ads and invest more in our content. We have some awesome gifts for our Patreons and more coming.
Here are a few of the articles that we will discuss during the podcast:
Here’s the live stream for today’s episode starting at 4:00 p.m. ET (or the video after 5 p.m. ET):
FTC: We use income earning auto affiliate links.More.
The Chinese EV leader is launching a new flagship electric sedan. BYD’s new Han L EV leaked in China on Friday, revealing a potential Tesla Model S Plaid challenger.
What we know about the BYD Han L EV so far
We knew it was coming soon after BYD teased the Han L on social media a few days ago. Now, we are learning more about what to expect.
BYD’s new electric sedan appeared in China’s latest Ministry of Industry and Information Tech (MIIT) filing, a catalog of new vehicles that will soon be sold.
The filing revealed four versions, including two EV and two PHEV models. The Han L EV will be available in single- and dual-motor configurations. With a peak power of 580 kW (777 hp), the single-motor model packs more power than expected.
BYD’s dual-motor Han L gains an additional 230 kW (308 hp) front-mounted motor. As CnEVPost pointed out, the vehicle’s back has a “2.7S” badge, which suggests a 0 to 100 km/h (0 to 62 mph) sprint time of just 2.7 seconds.
To put that into perspective, the Tesla Model S Plaid can accelerate from 0 to 100 km in 2.1 seconds. In China, the Model S Plaid starts at RBM 814,900, or over $110,000. Speaking of Tesla, the EV leader just unveiled its highly anticipated Model Y “Juniper” refresh in China on Thursday. It starts at RMB 263,500 ($36,000).
BYD already sells the Han EV in China, starting at around RMB 200,000. However, the single front motor, with a peak power of 180 kW, is much less potent than the “L” model. The Han EV can accelerate from 0 to 100 km/h in 7.9 seconds.
At 5,050 mm long, 1,960 mm wide, and 1,505 mm tall with a wheelbase of 2,970 mm, BYD’s new Han L is roughly the size of the Model Y (4,970 mm long, 1,964 mm wide, 1,445 mm tall, wheelbase of 2,960 mm).
Other than that it will use a lithium iron phosphate (LFP) pack from BYD’s FinDreams unit, no other battery specs were revealed. Check back soon for the full rundown.